Home>

¢õ¢ó. Business Type and Schedule


For the Silicon Materials and Ferro Alloys Producing Project


Item Description Remark
1 Technical Proposal 30-60days
1.1. T. Procedure & Ways  
1.2. Marketing Report  
1.3. E. & F. Analysis  
1.4. Feasibility Study Report  
1.5. Business Plan  
2 Basic Design 60-90 days
2.1. Furnace  
2.2. EPS  
2.3. Steel workshop  
2.4. Layout (m&b)  
2.5. Electricity solution  
2.6. Water supply  
3 Industrial Design 150-180 days
3.1. Furnace  
3.2. EPS  
3.3. Feeding  
3.4. Steel workshop  
3.5. Electricity solution  
3.6. Water solution  
3.7. Foundation  
3.8. Building construction  
4 Machinery & Equipment 120-150 days
4.1. Furnace  
4.2. Feeding  
4.3. EPS  
4.4. Accessories/fittings  
4.5. Inst. Equipment/tools  
4.6. Steel Materials  
4.7. A. & T. Instruments  
4.8. Spare parts  
5 Supervision & T. Service As per user¡¯s request
5.1. Geo-engineering  
5.2. Civil works  
5.3. Building construction  
5.4. Equipment installation  
5.5. Equipment debugging  
5.6. Trial producing  
5.7. Operation & management  
5.8. Quality controlling  
6 Special Service As per user¡¯s request
6.1. Products R & D  
6.2. New Technology  
6.3. Know-how  

Note:
1. All above items and related explanation shall be subject to the written confirmation made by Sinosi technical dept.
2. All above prices and related remarks shall be adjustable according to the confirmed design, specifications and amendments if necessary.
3. All of above confirmation shall be subject to the authorized personal signature and Sinosi company stamp.

If you have any interest or enquiry for above, then please contact us:
Tel: (86-10) 82070680 Fax: (86-10) 82070690
E-Mail: sales@sinosi.com or service@sinosi.com or sinosi@sinosi.com
Http://www.sinosi.com/project ;